Agricultural projects,
planned as a whole.

From the first assessment to preparation for operations, BESİN AG connects the land, production systems and infrastructure behind agricultural and livestock investments.

Concept collage bringing together a dairy cow and sheep, irrigated farmland, grain, a livestock barn, silos and processing infrastructure, with restrained blue watercolor accents.
Production systems

Dairy & livestock operations

Planning for dairy, beef and sheep operations, with the farm layout, housing, feeding systems and supporting infrastructure considered together.

Planning focus

  • Farm layout and the relationship between facilities
  • Animal housing and feeding systems, including TMR
  • Infrastructure supporting the operation
Smiling dairy cow and sheep in a soft architectural illustration
Land & resources

Farmland & irrigation

Site assessment, irrigation design and mechanisation planning for new and existing farms, grounded in the conditions and resources of the site.

Planning focus

  • Site conditions and available resources
  • Irrigation design for the proposed farming operation
  • Mechanisation and farm infrastructure planning
Wide architectural irrigation concept with a blue reservoir and water channels, pale green fields and a shallow perspective extending to the right
Agricultural infrastructure
Horizontal storage and processing concept with twin grain silos and a conveyor, a low processing hall, and stainless tanks and pipework arranged alongside

Storage & processing

Infrastructure planning for grain storage, cold chains and milk and meat processing, considered alongside the wider agricultural operation.

Planning focus

  • Grain storage infrastructure
  • Cold-chain and agricultural logistics infrastructure
  • Infrastructure for milk and meat processing

How a project develops

From feasibility to start-up

Each stage builds on the decisions before it, starting with the site and operating requirements and moving towards an agreed plan for implementation.

Step 01

Feasibility

Clarify the investment brief, review site conditions and identify the assumptions that need further investigation before moving forward.

Step 02

Master planning

Link the proposed production systems, buildings and infrastructure in one coherent layout, shaped by the site and the intended operation.

Step 03

Implementation & start-up

Set out the sequence from the agreed plan to construction and operational preparation, with activities and responsibilities defined for the project.

The activities, deliverables and responsibilities for each stage need to be defined for the individual project. This draft does not set out a contractual scope of work.

Be ready for questions

To make the most of our first conversation, it helps to have a few details in mind: your project location, what you are planning, its current stage and your intended timeframe. An initial idea is enough; we can explore the details together.

  • 01
    The locationCountry, region and whether a site has been selected.
  • 02
    The proposed operationWhat you plan to build or expand, and its approximate scale.
  • 03
    The current stageThe decisions already made and the next question to resolve.
  • 04
    The intended timingAny known milestones, constraints or target dates.

Your next step

Tell us what you’re planning.

Introduce your project and the stage you have reached.

Prepare a project inquiry